Skip to content
Free on-site quotes across Camberwell and the City of Boroondara (03) 4824 0315
Camberwell Concreting

Driveways / Exposed aggregate / Paths / Patios / Slabs

Concrete paths and side access in Camberwell and Boroondara

Front paths, porches and the strip down the side of the house, poured to a proper fall on a compacted base across the City of Boroondara, including the narrow and shared access runs period blocks are known for.

  • Prepped base built to suit Boroondara's clay
  • Steel mesh reinforcement in every slab
  • Fixed written quote after a site measure

Get a free concreting quote

We look forward to working with you and creating an outstanding finish.

Or call (03) 4824 0315

Free site measure Fixed written quote Insured contractor Camberwell and the City of Boroondara only

From $90 to $130 per m², supplied and laid. Prices may vary with site conditions and variations.

Paths fail the same way driveways do, just faster, because they are poured thinner and closer to the fence line where the ground was never compacted. On a Boroondara block the side path is also the working corridor of the house, the one route from the street to the back yard, so when it lifts over roots or ponds against the wall it is felt every day.

The strip down the side of the house

The classic job in Camberwell, Hawthorn and Surrey Hills is the side strip on a period block: a narrow run between the house and the fence, cracked into plates, lifting at the joints and draining the wrong way. The old path comes out, the base is compacted, and the new path is poured at 75mm minimum, stepped up to 100mm where a vehicle crosses it, with the fall set away from the wall. Where the gap is too tight for a barrow, the concrete is pumped, and that is priced in the written quote rather than discovered on the day. Shared access between two homes is set out and agreed with both owners in writing first.

Front paths and porches

A front path through an established garden is as much setting out as concreting: it has to meet the porch and the gate at the right levels, clear mature root zones, and sit against original tiles or bluestone edges cleanly. Porch slabs and steps are formed to a safe rise and tread and finished to match the path. Broom finished plain concrete is the economical standard; coloured and exposed aggregate carry the driveway finish through so the whole frontage reads as one build.

What it costs

Paths run $90 to $130 per square metre supplied and laid. The honest advice is to pair them: a path poured on the same day as a driveway, a patio or a garage slab prices at the low end of the range, because the crew and the truck are already there. The cost guide shows worked examples, the calculator gives a quick range, and the specification page covers the build-up under the surface.

Where we do this work

Balwyn, Balwyn North, Camberwell, Canterbury, Glen Iris, Hawthorn, Hawthorn East, Kew, Kew East, Surrey Hills and the wider City of Boroondara.

Process

From enquiry to a surface you can use

  1. Enquiry

    Call or send the form with the suburb and the job. A site measure is booked, usually within a few days.

  2. Site measure and fixed quote

    Dimensions, fall, access and drainage are assessed on site, along with any permit the council requires. The written quote is fixed.

  3. Preparation and pour

    Existing surface removed and the area prepped, with base material brought in where needed. Steel laid, council inspection at the crossover where one applies, then the pour. Most residential jobs are one to two days on site.

  4. Cure and seal

    Vehicles off for seven days. Exposed aggregate is sealed after the concrete has cured.

Concrete paths and side access questions

How much does a concrete path cost?

Paths run $90 to $130 per square metre supplied and laid. A typical 15 metre side strip at a metre wide lands between $1,400 and $2,000. Small stand-alone jobs carry a higher per metre rate than paths poured alongside a driveway, because the crew and truck cost the same to mobilise. Prices may vary with site conditions and variations; the written quote after a site measure is fixed.

Can you work in a gap under a metre wide?

Yes. Side access on Boroondara's period blocks is often under a metre between the house wall and the fence, too tight for a barrow. Where that is the case the concrete is pumped in with a line pump, and obstacles like gas meters, downpipes and tree roots are formed around rather than boxed in.

How thick is a concrete path?

Paths are poured at 75mm minimum, and at 100mm where vehicles cross them, such as a path crossing a driveway or gateway. Mesh goes in where the ground or the use calls for it, and the fall is set so water moves away from the house wall.

Can the path match my existing driveway or front path?

Yes. Plain, broom finished, coloured or exposed aggregate can carry through so the frontage reads as one job, and where an original path is staying, the new work is poured to a clean joint line so the change reads as deliberate rather than as a patch.

Call (03) 4824 0315 Get a quote